Training | Wastewater management, Properly treating wastewater
Training of Trainers (ToT) for T&G Sector
© ToT T and G Sector
Downloads
ToT Day 1: Handout Environmental Policies
ToT Day 1.2 Handout: Environmental Protection rules DoE
ToT Day 1 Handout: Shilpodushon
Document
ToT Day 1.1 presentation: Need for training for ETP Operators & expected outcomes
ToT Day 1.2 presentation: Water for industries-Importance & need for conservation
ToT_Day 1.3 presentation: DoE Regulations
ToT Day 1.4 presentation: Pollution in textile effluents
ToT Day 2.1. Handouts: Operation Control Biological Treatment
ToT Day 2.2 Handouts: Operation Control record keeping and trouble shooting of primary treatment
ToT Day 2.2 Handouts: Problems and Solutions
ToT_Day 2_presentations_Details and operation of chemical treatment systems
ToT_Day 2_presentations_Details and operation of chemical treatment systems
ToT Day 2.1. Handouts: Operation Control Biological Treatment
ToT Day 2 presentations: Aeration Systems
ToT Day 3: ETP Visit checklist
Document
ToT Day 4 Handout: Bangladesh Standards and Guideline for Sludge Management (English)
ToT Day 4 Handout: Bangladesh Standards and Guidelines for Sludge Management (Bengali)
ToT Day 4: Bangla-Manual for Sludge Management in Bangladesh Textile Sector
ToT_Day 5 Handouts: Chart for Wastewater sampling
ToT Day 4 Handout: Classification of Sludge
ToT_Day 4_Handout_Manual for Sludge Management in Bangladesh in Textile Sector
ToT_Day 4_Handout_Technical Report Textile Sludge Management in Bangladesh
ToT Day 4 presentations: Sludge Treatment
ToT Day 4.2 presentations: Sludge volume reduction & disposal
ToT_Day 4.3_presentations: Effluent sampling & Analysis
ToT Day 4.4. presentations: Tertiary treatment
ToT Day 4.5 presentations: Quizzes ETP
ToT Day 4.6 presentations: ETP Calculation
ToT Day 5 Handouts: ETP OHS Matrix
Document
ToT Day 5.2 Handouts: Prevalent Hazards in ETP Bangla
ToT Day 5.3 Handouts: Occupational Health and Safety
ToT Day 5.4 Handouts: UNIDO
ToT Day 5.5 : Safe Re-Start of ETP - FAQ Part 1
ToT_Day 5_Safe Re-start of ETP- FAQ Part 2
ToT Day 5.6 Handouts: SOP for restarting of Textile ETPs final
ToT Day 5.1 presentations: advanced biological treatments
ToT Day 5.2 presentations: Safety Management
ToT Day 5.3 presentations: Membrane based treatment
Characteristics
Phase of intervention
Operating SIA
Level of intervention
Park management
Regions
Asia
Countries
Bangladesh
Target groups
Company, SME, Industrial area management and operator